Optimizing of the installed capacity of hybrid renewable energy with a modified MPPT model
Abstract
The lack of wind speed capacity and the emission of photons from sunlight are the problem in a hybrid system of photovoltaic (PV) panels and wind turbines. To overcome this shortcoming, the incremental conductance (IC) algorithm is applied that could control the converter work cycle and the switching of the buck boost therefore maximum efficiency of maximum power point tracking (MPPT) is reached. The operation of the PV-wind hybrid system, consisting of a 100 W PV array device and a 400 W wind subsystem, 12 V/100 Ah battery energy storage and LED, the PV-wind system requires a hybrid controller for battery charging and usage and load lamp and it’s conducted in experimental setup. The experimental has shown that an average increase in power generated was 38.8% compared to a single system of PV panels or a single wind turbine sub-system. Therefore, the potential opportunities for increasing power production in the tropics wheather could be carried out and applied with this model.
Keywords
MPPT; PV cells; Renewable energy; Wind turbine
Full Text:
PDFDOI: http://doi.org/10.11591/ijece.v12i1.pp73-81
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
International Journal of Electrical and Computer Engineering (IJECE)
p-ISSN 2088-8708, e-ISSN 2722-2578
This journal is published by the Institute of Advanced Engineering and Science (IAES) in collaboration with Intelektual Pustaka Media Utama (IPMU).