Reliability Constrained Unit Commitment Considering the Effect of DG and DR Program

Masoud Aliakbari, Pouria Maghouli, Habib Allah Aalami

Abstract


Due to increase in energy prices at peak periods and increase in fuel cost, involving Distributed Generation (DG) and consumption management by Demand Response (DR) will be unavoidable options for optimal system operations. Also, with high penetration of DGs and DR programs into power system operation, the reliability criterion is taken into account as one of the most important concerns of system operators in management of power system. In this paper, a Reliability Constrained Unit Commitment (RCUC) at presence of time-based DR program and DGs integrated with conventional units is proposed and executed to reach a reliable and economic operation. Designated cost function has been minimized considering reliability constraint in prevailing UC formulation. The UC scheduling is accomplished in short-term so that the reliability is maintained in acceptable level. Because of complex nature of RCUC problem and full AC load flow constraints, the hybrid algorithm included Simulated Annealing (SA) and Binary Particle Swarm Optimization (BPSO) has been proposed to optimize the problem. Numerical results demonstrate the effectiveness of the proposed method and considerable efficacy of the time-based DR program in reducing operational costs by implementing it on IEEE-RTS79.

Keywords


demand response program; distributed energy resources; operation; particle swarm optimization; reliable and economic; simulated annealing; unit commitment

Full Text:

PDF


DOI: http://doi.org/10.11591/ijece.v8i4.pp1985-1996

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

International Journal of Electrical and Computer Engineering (IJECE)
p-ISSN 2088-8708, e-ISSN 2722-2578

This journal is published by the Institute of Advanced Engineering and Science (IAES) in collaboration with Intelektual Pustaka Media Utama (IPMU).